Trees and planning
Arboricultural Method Statements
Your trees are approved for keeping. Now they need protecting while you build. An Arboricultural Method Statement sets out exactly how, in plain instructions your contractor can follow, and we can supervise the work on site.

In short
What is an Arboricultural Method Statement?
An Arboricultural Method Statement is a practical set of instructions for building near retained trees. It covers when protective fencing goes up and comes down, how any work inside root protection areas will be done, and which stages need an arboriculturist on site. It comes with a Tree Protection Plan showing the trees on your proposed layout with every protection measure marked. Councils often require both by planning condition before work can start.
Last reviewed November 2026
The planning journey
From first survey to finished build
- 1Before the layout is drawnBS5837 Tree Surveywith the Tree Survey Plan
- 2For the planning applicationArboricultural Impact Assessmentwith the Tree Constraints Plan
- 3Protecting trees during the buildArboricultural Method Statementwith the Tree Protection Plan
- 4Making sure it happens on siteArboricultural Site Supervisionchecks and records for the council
Protected trees? If any trees have a Tree Preservation Order or are in a Conservation Area, we deal with the council’s consent alongside any of these steps.
Most projects need several of these. We can quote for them together and carry them through from the first survey to completion, so you deal with one consultant and the reports all fit together.
What it covers
Clear instructions for building near trees
Every Method Statement is written for your build and your contractor, not copied from a template. It sets out the order of work and exactly what happens near each retained tree.
- The order of works and tree protection
- Methods for work inside root protection areas, such as hand digging, no-dig surfacing, pile-and-beam foundations or trenchless services
- Protective fencing and ground protection, shown on the Tree Protection Plan
- Any pruning or removals needed before work starts
- The stages that need supervision or monitoring
Site supervision
Making sure the protection happens
Pre-start meeting
We meet your contractor on site to agree how the trees will be protected.
Protection checks
We check fencing and ground protection are in place before work starts.
Supervising sensitive work
We attend when digging or surfacing happens close to retained trees.
Records for the council
A dated record of every visit, with photos, to help discharge the conditions.
How it works
From first call to final report
Tell us about the site
An address or a plan, and what the survey’s for.
Get a fixed quote
We confirm which trees are included and what it’ll cost.
We survey on site
Every tree inspected and mapped, with drone images where they help.
You get the report
The report, schedule and plan, with every recommendation given a priority.
Price
How much does an Arboricultural Method Statement cost?
An Arboricultural Method Statement typically costs £640 to £750 plus VAT, and site supervision £420 to £500 per visit. No two sites are the same, so we quote for each one. It depends mainly on:
- How many retained trees are close to the work
- How much work happens inside root protection areas
- How many supervision visits the planning conditions require
- Whether we prepared the earlier tree reports
Questions
Method Statement questions
Is a Method Statement a planning condition?
Often. Councils commonly require an approved Method Statement and Tree Protection Plan before work starts on site.
What is no-dig construction?
A way of building paths, driveways and parking over tree roots without digging into them, using a cellular base laid on top of the ground. It keeps the roots intact and the soil uncompacted.
Can services go through a root protection area?
Sometimes, using methods such as hand digging or trenchless installation. The Method Statement sets out how.
What does the Tree Protection Plan show?
Your proposed layout, the trees being kept and removed, and every protection measure: fencing, ground protection and areas needing special construction methods.
Do I need site supervision?
If your planning conditions require it, or if work happens close to retained trees. We’ll tell you which stages need a visit.
How much notice do you need for a site visit?
A few days is usually enough. Tell us your programme at the start and we’ll plan the visits around it.
Can you do all the reports together?
Yes, and most clients do. We can quote for the full set at the start, from the BS5837 Tree Survey through to site supervision, so every report is consistent and you only deal with us.
Where we work
Arboricultural Method Statements across Scotland
We’re based in Paisley and carry out Arboricultural Method Statements all over Scotland, most often in Glasgow, the west of Scotland and the central belt. Larger programmes regularly take us further afield.